スペース・プログラミングと要件管理のソフトウェア
dRofusは、AEC/Oチームに、プロジェクト要件を定義、管理、検証するための、体系化されたデータ中心の環境を提供します。初期の計画段階から、設計、施工、運用に至るまで。単一のプラットフォーム、信頼できる唯一の情報源。
Why dRofus?
dRofus is built on principles that support smarter planning, better collaboration, and reliable project delivery. Together, they create a connected digital foundation that keeps requirements, data, and stakeholders aligned from early planning through design, construction, and operations.
dRofus brings structure and clarity to project planning by connecting requirements, design, and compliance in one shared platform—supporting better decisions from early planning through operations.
-
Plan with clarity from day one: Structure space, room, and asset requirements early to reduce uncertainty.
-
Validate design decisions continuously: Ensure designs meet requirements, standards, and regulations across all phases.
-
Deliver predictable, long-term value: Maintain a reliable digital foundation from construction through operations.
Stop chasing data across spreadsheets, PDFs, and disconnected systems. With dRofus, all project requirements—from room data and equipment lists to design standards and compliance criteria—are captured and managed in one connected platform.
- Connect requirements to BIM models for real-time validation and consistency.
- Share accurate, up-to-date information across all disciplines and project phases.
- Streamline handoffs between owners, design, construction, and operations for smoother project delivery.
With shared access to live project information, teams can track changes, compare revisions, and align design intent with project goals—without relying on manual updates.
- Change tracking & version history: See what changed, when, and by whom—ensuring transparency and accountability across teams.
- Role-based access & permissions: Control data visibility for owners, consultants, and contractors to maintain consistency and security.
- Prebuilt and customizable reporting tools: Generate professional, up-to-date summaries with a single click—no manual data wrangling required.
dRofus links every room, space, and equipment item to defined standards—so your project stays aligned with owner requirements and compliance is effortless at every stage.
- Built-in standards libraries: Apply national, regional, or organization-specific guidelines directly to your project data.
- Audit-ready traceability: Maintain a transparent record of every change, decision, and approval.
- Reduce risk with consistent data: One verified source of truth eliminates manual checks and compliance errors.
![Smarter Planning. Better Project Delivery]()
よりスマートな計画。より優れたプロジェクトの遂行
dRofusは、要件、設計、コンプライアンスを1つの共有プラットフォームで連携させることで、プロジェクト計画に体系性と明確さをもたらし、初期の計画段階から運用に至るまで、より適切な意思決定を可能にします。
-
初日から明確な計画を立案:スペース、部屋、資産の要件を早期に整理し、不確実性を低減する。
-
設計上の決定を継続的に検証:すべてのフェーズにおいて、設計が要件、基準、規制を満たしていることを確認する。
-
予測可能な長期的な価値を提供:建設から運用に至るまで、信頼性の高いデジタル基盤を維持する。
-
![Centralize Requirements. Eliminate Silos]()
要件の集中管理。サイロの排除
スプレッドシートやPDF、連携していないシステムの間を、データを探し回る必要はもうありません。dRofusを使えば、部屋のデータや設備リストから、設計基準やコンプライアンス基準に至るまで、すべてのプロジェクト要件を1つの連携されたプラットフォームで一元的に管理できます。共有された規格、テンプレート、命名規則により、チームやプロジェクトを問わず、情報の整合性が保たれます。
- 要件をBIMモデルと連携させ、リアルタイムでの検証と整合性の確保を実現します。
- すべての専門分野およびプロジェクトの各段階において、正確かつ最新の情報を共有します。
- 施主、設計、施工、運営の各段階間の引き継ぎを効率化し、プロジェクトの円滑な遂行を実現します。
![Enhance Collaboration. Reduce Rework]()
コラボレーションを強化。手戻りを削減
プロジェクトの最新情報をチームで共有することで、手作業による更新に頼ることなく、変更の追跡、改訂版の比較、そして設計意図とプロジェクト目標の整合を図ることができます。
- 変更履歴とバージョン管理:何が、いつ、誰によって変更されたかを確認でき、チーム全体での透明性と説明責任を確保します。
- 役割ベースのアクセス制御と権限設定:
データの可視性を管理し、オーナー、コンサルタント、請負業者に対して明確な情報管理責任を割り当てることで、一貫性とセキュリティを維持します。 - あらかじめ用意されたカスタマイズ可能なレポート作成ツール:ワンクリックでプロフェッショナルで最新の要約を生成でき、手動でのデータ加工は不要です。
![Ensure Compliance. Avoid Costly Revisions]()
コンプライアンスを確実に遵守。コストのかかる修正を回避
dRofusは、すべての部屋、空間、設備アイテムを定義済みの基準と紐づけるため、プロジェクトは施主の要件に沿った状態を維持でき、どの段階でもコンプライアンスを容易に確保できます。
- 組み込み標準ライブラリ:国、地域、または組織固有のガイドラインをプロジェクトデータに直接適用できます。
- 監査対応の追跡可能機能:あらゆる変更、決定、承認について、透明性の高い記録を維持します。
- 一貫性のあるデータでリスクを低減:検証済みの単一の信頼できる情報源により、手作業によるチェックやコンプライアンス上のミスを排除します。
WHY DROFUS?
Smarter Planning, Better Project Delivery
dRofus unifies every aspect of your project—from space planning and design validation to compliance and collaboration—within a single, structured platform that keeps all stakeholders aligned and informed. By maintaining a continuous digital thread from planning through operations, dRofus ensures efficiency, accuracy, regulatory confidence, and long-term value across the entire building lifecycle.

Centralize Requirements. Eliminate Silos.
Stop chasing data across spreadsheets, PDFs, and disconnected systems. With dRofus, all project requirements—from room data and equipment lists to design standards and compliance criteria—are captured and managed in one connected platform.
- Connect requirements to BIM models for real-time validation and consistency.
- Share accurate, up-to-date information across all disciplines and project phases.
- Streamline handoffs between owners, design, construction, and operations for smoother project delivery.

お客様の声
“クライアントの要件を、共有可能なモデルの形で明確に定義するためのツールが必要でした。IFCへの対応とdRofusの機能を考慮すると、dRofusが私たちに強力な解決策を提供してくれることは明らかでした。”
“dRofusは、業界の常識を一変させる存在でした。当社のモデル、設備仕様書、部屋データシート、
そして調達業務間の連携を効率化し、顧客満足度の向上とミスの最小化に貢献しています。”
"当社では、すべての分野をカバーする単一のマスターデータベースを用意しており、これは各モデルと同期されています。
このデータベースは常に最新の状態で、チーム全員が利用可能です。"
AEC業界のリーダー
世界中の病院、大学、空港、政府機関から信頼を得ており、これらの機関ではデータの正確性、コンプライアンス、およびプロジェクトの完全な可視性が極めて重要とされています。












Enhance Collaboration. Reduce Rework.
With shared access to live project information, teams can track changes, compare revisions, and align design intent with project goals—without relying on manual updates.
- Change tracking & version history: See what changed, when, and by whom—ensuring transparency and accountability across teams.
- Role-based access & permissions: Control data visibility for owners, consultants, and contractors to maintain consistency and security.
- Prebuilt and customizable reporting tools: Generate professional, up-to-date summaries with a single click—no manual data wrangling required.

Ensure Compliance. Avoid Costly Revisions.
dRofus links every room, space, and equipment item to defined standards—so your project stays aligned with owner requirements and compliance is effortless at every stage.
- Built-in standards libraries: Apply national, regional, or organization-specific guidelines directly to your project data.
- Audit-ready traceability: Maintain a transparent record of every change, decision, and approval.
- Reduce risk with consistent data: One verified source of truth eliminates manual checks and compliance errors.

Explore the Core Capabilities of dRofus





Define and structure space, room, equipment and asset requirements early, then validate them as the design develops.
Define and structure space, room, equipment and asset requirements early, then validate them as the design develops.
Connect dRofus with BIM, FM, cost and operational systems while keeping information consistent across every tool.
Read MoreConnect dRofus with BIM, FM, cost and operational systems while keeping information consistent across every tool.
Read More
Turn structured project data into clear, consistent reports tailored to different teams, decisions and project stages.
Read MoreTurn structured project data into clear, consistent reports tailored to different teams, decisions and project stages.
Read More
Give stakeholders secure browser access to current project information, with role-based access and clear data responsibilities.
Read MoreGive stakeholders secure browser access to current project information, with role-based access and clear data responsibilities.
Read More
Connect project requirements with BIM, coordinate information across disciplines and identify departures before they become costly changes.
Read MoreConnect project requirements with BIM, coordinate information across disciplines and identify departures before they become costly changes.
Read More
プロジェクト情報を確実に管理
これらの機能により、部屋、要件、コンテンツ、およびドキュメントの体系的な管理が可能になります。これらを組み合わせることで、プロジェクト情報がライフサイクル全体を通じて相互に関連付けられ、一貫性を保ち、再利用可能な状態を維持できるようになります。
チーム全体で、物理的なスペースに関する共通認識を築く。
部屋モジュールこそが、プロジェクトのスペース設計の真の出発点となります。機能要件、設計形状、ワークフローのニーズなどによって定義されるあらゆる空間を、構造化され検索可能な登録簿に記録・整理します。すべての部屋を分類・グループ化したり、プログラム基準と関連付けたりすることができ、チームは建物のスペース構成を一元的に把握することができます。
部屋は、計画や設計上の意思決定に体系性と明確さをもたらします。一意の識別子、階層的な構成、そしてより広範なdRofusデータモデルへの統合により、チームは分野を横断して要件と、実装および検証のワークフローを整合させることができます。
-
階層、グループ、識別子を用いて部屋を定義、整理。
-
プログラムされた面積、機能、プロジェクトの要件を把握。
-
検証のために、部屋を計画およびBIMワークフローと連携。
スピードと一貫性を高めるために、プロジェクトのベースラインを標準化します。
テンプレートモジュールを使用すると、複数のスペースにまたがる要件を定義した、再利用可能な部屋やアイテムのテンプレートを作成および管理できます。テンプレートは "生活水準" のような役割を果たします。1か所で行った更新は、リンクされたすべての部屋に反映されるため、チームは一貫性を維持し、手動での更新作業を削減できます。
テンプレートを使用することで、大規模なプロジェクトや反復的なプロジェクトにおける設定作業を迅速化し、設計基準への準拠を確保するとともに、部屋データやアイテムリストの標準化された分配を可能にします。これにより、チーム間で定義の統一が図られ、設計や施工が始まる前の段階でミスを減らすことができます。
-
繰り返し可能なワークフローのための、標準化された部屋およびアイテムのテンプレートを作成。
-
テンプレートを部屋に適用し、テンプレートの継承を管理。
-
一元的に更新し、リンクされたスペース全体で一貫性を確保。
家具、設備、建築要素を一か所で管理。
アイテムモジュールは、コンテンツプランニングの基盤となるもので — 家具、備品、設備、建築要素を定義・分類し、部屋やテンプレートに割り当てる場所です。アイテムは、プランニングデータと、積算、コスト分析、調達といった成果物をつなぐ架け橋としての役割を果たします。
アイテムをプロジェクトごとに定められたグループに整理し、部屋やテンプレートに関連付けることで、チームは数量、責任範囲、仕様を確実に追跡することができます。また、アイテムはBIMモデルにもリンクされており、設計プラットフォーム間での検証や一貫性の確保に役立ちます。
-
プロジェクトアイテム(FF&Eおよび設備)の定義と分類。
-
アイテムを部屋やテンプレートに直接割り当てる。
-
数量算出およびその後の作業の流れをサポート。
すべてのオブジェクトと作業の流れに関するドキュメントを一元管理します。
ドキュメントモジュールは、図面から仕様書に至るまで、あらゆるプロジェクトファイルを一元管理できる構造化されたリポジトリを提供し、これらは部屋、アイテム、システム、その他のオブジェクトに直接関連付けられています。ドキュメントは関連するエンティティと常にリンクされた状態を保つため、担当者は常に適切なファイルを確実に見つけることができます。
ドキュメント機能を使えば、断片化したファイル管理システムを解消し、添付ファイルを関連する文脈の近くに保管できます。PDFを部屋に関連付けたり、技術仕様書をアイテムやシステムにリンクさせたりする場合でも、すべて同じ共有データベースからアクセス可能です。
-
建築オブジェクトにファイル(PDF、画像、仕様書)を添付・管理。
-
コンテキストに基づいてドキュメントを検索・取得。
-
プロジェクトの記録を1か所にまとめて整理・管理。
初期のプロジェクト意図を把握し、体系化します。
機能データモジュールは、設計形状が確定する前段階から、クライアントの目標、各部門の要件、およびプログラム上の基準を把握するのに役立ちます。この初期段階での計画により、バラバラのスプレッドシートやドキュメントが、チームやツールが活用できる体系化された信頼できる情報源へと変わります。
機能要件を単一のリポジトリに整理することで、機能データは戦略的計画の策定、隣接関係の定義、および部屋やテンプレートといった下流モジュールとの整合性を支援し、プロジェクトの空間的な意図を測定可能な要件として定着させます。
-
プロジェクトまたは部門レベルで機能要件を収集。
-
計画および検証のためにプログラムデータを体系化。
-
戦略的意図を空間および設計の作業プロセスに反映。
データを実用的な洞察と成果物にを変換。
レポートとエクスポートモジュールを使用すると、チームはプロジェクトデータ(部屋、アイテム、テンプレート、機能要件など)から、ニーズに合わせたPDFレポートやExcelファイルを作成できます。60種類以上の組み込みレポートと柔軟なエクスポートオプションにより、プロジェクトの進捗状況、スケジュール、数量などを正確に共有できます。
レポートはカスタマイズしたり、お気に入りとして保存したり、利害関係者と共有したり、作業プロセスに組み込んだりすることができます。これにより、構造化されたプロジェクト情報を会議やドキュメントセット、引き継ぎ資料などに容易に取り入れることが可能になります。
-
各モジュール(部屋、アイテム、テンプレート)にわたる詳細なPDFレポートを生成。
-
分析や連携のために、構造化されたデータをExcelにエクスポート。
-
プロジェクトのニーズに合わせてレポートテンプレートをカスタマイズおよび共有。

ノルウェーのこの大手病院では、dRofusがプロジェクト要件を定義・管理するための体系的な環境を提供しました。利害関係者には、完全な可視性と管理権限がもたらされ、手戻りを削減するとともに、厳格な医療基準への準拠が確保されました。
Read More
オーストラリア最大級の都市再生プロジェクトの1つであるdRofusでは、複数の専門分野にわたる要件やモデルデータを一元管理しました。これにより、設計チームと施工業者は、あらゆる段階で同一の検証済み情報に基づいて作業を行うことが可能となりました。
Read More
バプテスト・ヘルスは、dRofusを活用して、複雑な医療施設全体における部屋、設備、システムの要件を統一しました。その結果、明確なドキュメント作成、リスクの低減、そして計画段階から運用開始に至るまでの信頼できる情報源が実現しました。
Read More
One Source of Truth
Whether you’re designing in Revit or Archicad, planning equipment, or preparing for operations—dRofus connects every role. Our integrations ensure that all stakeholders collaborate around validated requirements and consistent project data.

Set your standards before design begins. With dRofus, control requirements from day one to ensure every space, system, and asset aligns with your goals—reducing risk and delivering true value.
Set your standards before design begins. With dRofus, control requirements from day one to ensure every space, system, and asset aligns with your goals—reducing risk and delivering true value.

Design with confidence, fully aligned to project scope. dRofus links your models to validated requirements—reducing revisions, removing uncertainty, and enabling faster, more accurate delivery from the start.
Design with confidence, fully aligned to project scope. dRofus links your models to validated requirements—reducing revisions, removing uncertainty, and enabling faster, more accurate delivery from the start.
Read More
Plan and coordinate with accuracy from the start. dRofus gives engineers verified room and system requirements, reducing conflicts and improving team coordination.
Plan and coordinate with accuracy from the start. dRofus gives engineers verified room and system requirements, reducing conflicts and improving team coordination.
Read More
Deliver exactly as envisioned. dRofus aligns planned work to validated requirements, giving you the right information at the right time—reducing rework and keeping expectations clear.
Deliver exactly as envisioned. dRofus aligns planned work to validated requirements, giving you the right information at the right time—reducing rework and keeping expectations clear.
Read More
Turn models into trusted, data-rich deliverables. With live Revit and Archicad integrations, dRofus enables validation, change tracking, and seamless coordination.
Turn models into trusted, data-rich deliverables. With live Revit and Archicad integrations, dRofus enables validation, change tracking, and seamless coordination.
Read More初日から明確なビジョンで構築
dRofusは、要件、スペース、データを1つの信頼できる情報源に統合し、建物のライフサイクル全体にわたってより良い意思決定を支援します。
世界中の大手企業から信頼されています。
さらに詳しく知りたいですか?
動画を見る - 機能やワークフロー、お客様の事例を紹介しています。チャンネル登録し、dRofusがプロジェクトライフサイクルの全ての段階をどのようにサポートしているかをご確認ください。
dRofusはどのような種類のプロジェクトに最も適していますか?
dRofusは、複数の利害関係者が連携する必要がある複雑な建築・インフラプロジェクト向けに設計されています。データの正確性やライフサイクル全体の可視性が極めて重要となる、医療、教育、航空、公共部門のプロジェクトで広く活用されています。
dRofusは、プロジェクト計画の策定をどのように改善しますか?
dRofusは、要件を1つの構造化されたデータベースに一元化することで、チームに導入初日から信頼できる唯一の情報源を提供します。これにより、スプレッドシートへの依存を減らし、設計開始前にプロジェクトの範囲を明確にすることができます。
dRofusは、RevitやArchicad、その他のBIMツールと連携できますか?
はい。dRofusは、RevitやArchicadと直接連携し、IFCなどのopenBIM標準にも対応しています。これにより、計画データ、設計モデル、プロジェクト要件がリアルタイムで同期されます。
dRofusは、リスクや手戻りの削減にどのように役立つのでしょうか?
要件は、モデルやプロジェクト基準に対して継続的に検証されます。エラーを早期に発見することで、チームはコストのかかる手戻りを回避し、プロジェクトが当初の範囲に確実に沿うようにすることができます。
dRofusのプロジェクトデータは、施工後も利用できますか?
その通りです。dRofusは、運用やデジタルツインの観点から、プロジェクトデータが将来にわたって活用できるよう保証します。建物所有者や施設管理者は、建物のライフサイクル全体を通じて活用できる、構造化され、検証済みのデータを入手できます。
YOU DON'T HAVE TO LOVE CODE. WE GOT YOUR BACK.
We provide you with a clean and effective code behind the scenes. You will work with HubSpot\'s drag-and-drop editor and our POWERful module options.





